TYPCB Metal

HVAC & plumbing

Match valves and lines to the plant’s equipment schedule before installation.

What to specify

Keep the plant prefix, line number and valve identifier in separate spreadsheet fields. Specify attachment hole size and visibility after insulation is installed.

Can the same plate be used outdoors?

List exposure to moisture, chemicals and cleaning. Confirm the selected material, fastening and sample for that environment.

Products for this application